How to read this
- 20–60 t/hCapacity range of our standard lines, covering most cullet processing scenarios
- Six stagesDry cleaning, screening, colour sorting, eddy current, air density separation, iron removal — one closed loop
- 3 wkTypical time from arrival on site to acceptance test
After the calculation
Send us the daily tonnage, where the cullet comes from and the result you need. We will prepare the test and a proposal against it.